Project Overview. Dewatering complex for Municipal WWTP, Bridge City, Texas

Multi-disk screw press

In the plant sludge drying beds for sludge dewatering were used. This method required lots of labor and constant maintenance. Due to this reason, the customer was looking for the efficient and minimal maintenance solution.

On-site pilot tests were carried out, using mobile dewatering unit MDQ-201, to find the best dewatering technology. According to the test results Esmil offered sludge dewatering complex based on Multi-disk Screw Press MDQ-404(2) CL. The complex includes – influent sludge feed pump, polymer feeder, three screw conveyors and service platform.

Dewatering complex technological scheme

Results

  • TYPE OF SLUDGE – aerobically digested excess sludge
  • OPERATING TIME – up to 8 h/day, 3 days/week
  • UNIT SLUDGE SUPPLY – up to 40 (80*) gpm / up to 700 (880*) lbDS/h
  • INLET SLUDGE DS CONTENT – 3.5 %
  • CAKE DS CONTENT – approx. 22-23 %
  • POLYMER CONSUMPTION – 3.5 gal/tonDS
  • TSS CONCENTRATION IN FILTRATE – 200 ppm
  • DS CAPTURE RATE – 99.4%

*in case of adding two additional dewatering drums.

Multi Disk Screw Press MDQ